Nzoia Sugar Co. Ltd Domestic Sewerage System.

Project Title: Nzoia Sugar Co. Ltd Domestic Sewerage System.

Client: Nzoia Sugar Co. Ltd

Location within Country: Bungoma

No. of Staff: 7

Professional Staff provided by Our Firm/Entity(profiles):

  1. Water Engineer
  2. Sewerage Engineer
  3. Structural Engineer
  4. Environmentalist
  5. Quantity Surveyor

No of Staff-Months; Duration of Assignment: 25 Man-months

Start Date: (Month/Year): March 2011

Completion Date: Sept 2011

Approximate Value of Service (Kshs): KShs. 2 million

Name of Associated Consultants: None

No of Months of Professional Staff provided by Associated Consultants: N/A

Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed:

  1. Eng. B.M Owitti – Water/Sanitation Engineer
  2. J.W. Wangusi – Surveyor
  3. Eng. C. Gitahi – Structural Engineer
  4. Eng. J.M Barasa – Geotechnical Engineer

Narrative Description of project:

  • Detailed design of a new Sewage Treatment Works (Stabilisation Ponds).
  • Foul Sewerage Network for the project.
  • Utility building design.
  • Tender document preparation.

Description of Actual Services Provided by Your Staff:

  • Detailed design and Tender Documentation for the Sewerage System