Stormwater Drainage – Aga Khan

Project Title: Stormwater Drainage Project for Aga Khan Hospital, Kisumu

Client: Aga Khan Hospital Kisumu

Location within Country: Kisumu

No. of Staff: 5

Professional Staff provided by Our Firm/Entity(profiles):

  1. Roads Engineer
  2. Drainage Engineer
  3. Structural Engineer
  4. Environmentalist
  5. Surveyor

No of Staff-Months; Duration of Assignment: 20 Man-months: 5 months

Start Date: (Month/Year): Aug 2019

Completion Date: On Going

Approximate Value of Service (Kshs): KShs. 1.5 million

Name of Associated Consultants: None

No of Months of Professional Staff provided by Associated Consultants: N/A

Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed:

  1. Eng. B.M Owitti – Water/Sanitation Engineer.
  2. Pascal Okoth – Surveyor.
  3. C.M Shanyuma – Structural Engineer

Narrative Description of project:

  • Detailed design of stormwater drainage works.
  • Tender document preparation.
  • Construction supervision

Description of Actual Services Provided by Your Staff:

  • Detailed design and Tender Documentation for the stormwater drainage system and construction supervision